Projects
Diverse Projects – A Track-Record of Performance
Chapman Construction delivers electrical construction services to many prominent projects throughout Greater Boston, eastern Massachusetts, Cape Cod and the Islands. CCGI works both as a primary electrical contractor as well as a subcontractor to many of our region’s most prominent electrical contractors.
Here are just a few of our current and recently completed projects
Martha’s Vineyard – Vineyard Wind 1 Project’s Electrical Service Platform
Chapman Construction Group, Inc. (CCGI), based in Sandwich, MA, has been awarded and is underway with construction operations associated with the completion of offshore construction, installation and commissioning of the 800MW Vineyard Wind 1 project’s electrical service platform (ESP). The wind farm will be located approximately 14 miles southeast of Martha’s Vineyard and 35 miles off the Cape Cod peninsula. CCGI is working as a labor consultant and subcontractor with Tier 1 EPCI contractors Semco Maritime and Bladt Industries in the construction of the substation. The electrical service platform will provide electrical power generated from the Vineyard Wind project, which will be comprised of an array of 62 wind turbine generators to be installed on monopiles in water depths ranging from 121 to 181 feet in the Atlantic Ocean.
See Chapman Construction Group Vineyard Wind 1 Project Press Release on PR Newswire
Town of Orleans, MA Downtown Collection System & Pump Station
GC: Robert B. Our
Electrical Scope: Custom-build electrical enclosures; installation of electrical distribution panels, control wiring, VFDs, PLCs and generator to allow for pump station operation.
Unique Project Challenges: Due to supply chain delays in delivery of VFDs and electrical distribution panels, Chapman provided an interim solution for station’s pumps to operate, via installation of a “soft starter” motor controller. Teamed with general contractor in reengineering equipment pads and provided onsite installation temporary electrical distribution panels and interim control wiring.
Project Status: ongoing; completion scheduled Spring 2023
MBTA Red Line Signal Upgrade Project, Boston, MA
Electrical Contractor: CCGI serving as electrical subcontractor to primary electrical contractor, Fischbach & Moore.
Project Scope: Installation of MBTA Red Line signal upgrades from Park Street Station, Boston, MA to Quincy, MA; includes installation of cabling, signal bungalows; and wiring signals.
CCGI Crew Size: 6 Local 103 electricians
Project status: Ongoing
Keolis North Station MBTA Signal Upgrade, Boston, MA
Electrical Contractor: CCGI teaming as subcontractor to primary electrical contractor, Fischbach & Moore
Project Scope: Installation and testing of MBTA signal cabling for 6 new electrical bungalows.
Project Status: completed September 2022
Crew size: 4 IBEW Local 103 electricians
Ted Williams Tunnel Lighting Retrofit Project, Boston, MA
Electrical Contractor: CCGI as electrical subcontractor to primary electrical contractor, JF White
Project Scope: Demolition of existing tunnel lighting to allow for installation of all new LED lighting retrofit. Project completed in 2022.
Sumner Tunnel Lighting Project, Boston, MA
Electrical Contractor: CCGI as subcontractor to primary contractor, J.F. White
Project Scope: CCGI to purchase, furnish and install LED lighting throughout the Sumner tunnel; and furnish controls. Pre-fabrication of lighting fixtures in pre-fab shop to allow for optimal project efficiency in installation.
Project Status: Awarded and underway
Keolis Commuter Rail Maintenance Pump Station, Somerville, MA.
Project Scope: Turnkey control project to allow pumps to separate wastewater to be pumped from MBTA train wash-down facility to Buiding G. Comprises the installation of all electrical power and components for pump station operation, including conduits, remote panels, main frame controllers, wiring for 2 air dryers, piping and wiring of reverse osmosis (RO) skid, and 110v/208v sub-panel for all branch circuits.
MBTA Green Line Extension (GLX), Boston to Somerville and Medford, MA
GC: GLX Constructors
Electrical Scope: Temporary Power, Duct Banks, Wiring Cable along 7 miles of track, Stray Current
Crew Size: 33 electricians at peak
Town of Harwich, MA Pump Station
GC: Robert B. Our
Electrical Scope: Installation of main electrical service, generator, variable frequency drives and wiring
Ted Williams Tunnel, Boston, MA
GC: JF White
Electrical Scope: Lighting demolition and conversion to LED lighting
MBTA Adams Station and Garage Lighting, Quincy, MA and Braintree, MA
Subcontractor to: Mass Bay Electrical Corp.
Electrical Scope: Lighting upgrades
Town of Barnstable, MA Comprehensive Wastewater Management Plan –Phase One Pump Station
GC: CC Construction
Electrical Scope: Installation of main electrical service, generator, ATS enclosures, variable frequency drives, control systems, and wiring for submersible wastewater treatment pump station
Town of Orleans, MA Pump Station
GC: Robert B. Our
Electrical Scope: Installation of main electrical service, generator, variable frequency drives and wiring
Town of Scituate, MA Septage Wastewater Treatment Facility
GC: DanKris Builders
Electrical Scope: Furnish and install electrical equipment and wiring
MBTA Red Line and Orange Line Signal System Upgrades
Electrical subcontractor to Fischbach and Moore
Worcester Regional Airport Runway Lighting
Subcontractor to: McDonald Electrical Corp.
Electrical Scope: Installation of Runway Lighting
AMTRAK SCADA Conduit and Lighting Upgrades
Subcontractor to: McDonald Electrical Corp.
Electrical Scope: Installation of conduit for SCADA upgrades and lighting
Project Request Form
Chapman Construction Group looks forward to meeting your electrical construction project requirements. Please provide a brief project overview, and we'll respond promptly.